Calculate an IPL innings run rate
What changes when the final over is incomplete?

Convert balls before dividing
At 90 runs after 12.3 overs, 75 legal balls have been delivered. Divide 90 by 75 and multiply by six to obtain 7.20. Dividing by 12.3 treats the notation as decimal and gives the wrong answer.
Use the innings that is in front of you
Current run rate describes scoring to this point. Required run rate describes the pace needed to reach a target. A tournament table can show a third measure, net run rate, which needs data from more than the current innings.
A second check
If the next three legal deliveries produce six runs, the score becomes 96 after 13 complete overs. Divide 96 by 13 and round at the end to get 7.38.
Return to Home